ECM Design Singapore
Earth Control Measures for construction sites
Design and documentation support for construction site erosion control, sedimentation management and temporary drainage planning.
What the ECM design package can include
The content is written to help the project team understand what information is needed and why it matters.
1
Site runoff strategy
Review site layout, levels, discharge points and sequencing constraints.
2
Sediment control details
Prepare concepts for silt trap, perimeter control, wheel wash and temporary measures.
3
Maintenance notes
Provide practical inspection and maintenance notes for construction implementation.